A Smart Solution

Schools run on tight budgets, and energy is one of the few costs that only goes up. Every dollar of capital is usually already committed to classrooms, staff and students, so solar often ends up on the wish list rather than the roof. This case study looks at a proposed fully funded solar system for an independent school in Melbourne’s west, with no upfront investment from the school.

Stat blocks

 

Emmission Reduction

33.4%

Annual Generation

260 MWh

Savings

30%

System Capacity

200 kWp

Project details

  • Location: Melbourne West
  • Ownership Type: Owner-occupied
  • Business Type: Education (independent school)
  • Challenge: Rising energy costs with capital committed to education

The Challenge

The school’s energy costs had been climbing steadily with retail electricity prices, and the campus has a large roof sitting unused. Buying a solar system outright would have meant diverting capital away from students. Leasing wasn’t much better: it comes with credit checks and long approval processes, and the school would still carry the risk of owning and maintaining the system.

The Solution

MetroElectro proposed a 200 kWp rooftop solar system under our Energy-as-a-Service model. We fund, design, install, own and operate the system, and the school simply buys the electricity it produces.

The system would generate around 260 MWh a year, covering about a third of the school’s grid demand. The school would buy that power at a fixed rate around 38% below what it currently pays the grid for the same energy. That brings the school’s energy bill down by around 10% from the first year, and cuts emissions by about a third.

Why It Works for Schools

  • No capital required. The school pays nothing upfront, so funds stay with teaching and learning.
  • Savings from day one. The site is cash positive as soon as the system is switched on.
  • Protection from rising prices. A fixed energy rate gives the school more certainty over one of its biggest operating costs.
  • All of the savings, none of the split. As an owner-occupier, the school keeps 100% of the savings, and the building gets a free upgrade.
  • No maintenance headaches. MetroElectro looks after the system. We only earn when it performs, so our incentives line up with the school’s.
  • A visible commitment to sustainability. Cutting emissions by a third gives students a real example of climate action on their own campus.

The Process

From the first conversation, MetroElectro reviews the site’s billing data and prepares a preliminary offer. After a site visit and detailed modelling, we present a final offer. Once it’s signed, we handle the design, engineering, network approvals and installation. A system like this can be up and running in as little as 10 weeks from approval.

Get In Touch Today

If you run a school, warehouse or commercial site with a large roof and a big power bill, MetroElectro can show you what the right solution looks like for your site.